1. Inspect two worked rows.
The fictional example shows the actual columns, document mismatches and open decisions for this task.
West Virginia / Historical land evidence
Build an editable mining-history-to-operating-platform bridge, with source locators, open decisions and a file your team can review.
Terrain and history
Start the work product
One working file to take back to the team
The fictional example shows the actual columns, document mismatches and open decisions for this task.
Start blank, edit the cells and add as many records as the review needs, up to 200 rows per file.
Download the register as CSV or a readable text file, including source context and edition. The companion below helps organize the next document requests.
Your editable work product
Define the operating area and proposed work before attaching program records. Record the basis of every usable-area statement.
Start with a blank row or load the fictional example.
Your entries remain in this page only. Download or copy before leaving; nothing is automatically saved or fetched.
Add one record or comparison per row. Leave unknown facts blank or name the missing document. Scroll the table horizontally on a small screen. Each cell accepts up to 2,000 characters.
| Row | Program record / locationRecord the program record / location from the documents or leave it unresolved. | Proposed platformRecord the proposed platform from the documents or leave it unresolved. | Area basisRecord the area basis from the documents or leave it unresolved. | Grading / loadingRecord the grading / loading from the documents or leave it unresolved. | Access conditionRecord the access condition from the documents or leave it unresolved. | Document / page locatorEnter the actual file, page, exhibit or source record for this row. Method links below are not property evidence. | Remove |
|---|---|---|---|---|---|---|---|
| 1Your entry |
You can export this blank table before filling it in elsewhere. The export includes the kit edition, row provenance and method references. Method references do not verify your property.
If file saving is blocked, copy this into a UTF-8 .csv file.
This table does not upload documents, search records, run an AI model or confirm source facts. The next-request worksheet below is a separate companion; entries are not copied between the two tools.
Companion: document requests
This separate four-item sheet helps organize supporting requests. It does not copy or analyze the entries in your register.
Open, work, export
Define the operating area and proposed work before attaching program records. Record the basis of every usable-area statement.
Method and source context
These references explain the method. They do not verify facts about your property. Your export keeps their scope separate from the document references you enter.
West Virginia Department of Environmental Protection · Checked 2026-09-30
Directory of environmental, mining, oil-and-gas and document data resources.