Evidence
before usable yard.

Work through a site diagram, an acreage calculation and the documents still needed. Six public source paths and one synthetic teaching site. No parcel research or local approval has been completed.

01 Inspect the area02 Separate the evidence gates03 Export the next questionsSeptember 28, 2026 / Original regional add-on

Site model and review mode

SYN-VA-001 is entirely fictional. No address, owner or parcel identifier exists.

Teaching site A / SYN-VA-001Synthetic illustration

Visibility controls change the labels only. The generated site is conceptual and not scaled to these fictional inputs. All three areas remain in the arithmetic.

Supplied fictional note

Three inputs.
One limited calculation.

The two deductions are stipulated to be separate in this teaching fixture.

Gross site area12.0 ac
Subtract building1.0 ac
Subtract drainage2.0 ac
9.0acres

Arithmetic residual,
NOT verified usable yard.

Request evidence

Permitted use, access geometry, legal access and operating/lease inputs are UNRESOLVED.

The first real calculation starts with a boundary. A parcel-map outline is a research lead. Resolve a dated survey and the site boundary, then review the geometry of every exclusion. A numerical residual does not answer what use is permitted or what operation will fit.

02 / Evidence board

Five questions the
acreage cannot answer.

Select a gate to see the document request. Every gate remains unresolved for the synthetic site.

0 of 5 gates documentedA documentation state is not permission or suitability.

NO MATCH means a scoped search found no matching record. It does not establish absence. DOCUMENTED records a source ID and date for human review; it does not authenticate the document or approve a use.

Area method / A separate real-site check

Overlapping exclusions
cannot be subtracted twice.

Teaching site A stipulates non-overlap. Real site files must establish it. This conceptual illustration does not change the teaching fixture.

01 / COMMON BOUNDARY

Measure the same site.

Bring the survey, footprint and drainage evidence onto the same dated boundary and measurement basis. Resolve mismatched outlines before arithmetic.

02 / GEOMETRIC UNION

Count the shared part once.

If exclusions overlap, use a reviewed union of their areas. Adding both full areas would deduct the overlap twice.

03 / REMAINING GATES

Keep the open questions.

Setbacks, easements, circulation, surface condition, environmental constraints and use restrictions can still change what is operationally usable.

03 / Source desk

Know what each source
can establish.

Six official source paths reviewed on September 28, 2026. These are navigation references, not completed property research or an exhaustive Virginia inventory.

Checked date ≠ document date.A portal review tells you the page was checked. It does not date a survey, make a record current, or establish that a particular site was investigated.
Offline by design.Source addresses are selectable text. This guide makes no remote requests. Open a copied address separately when you choose to research it.
04 / Question handoff

Leave with a better
evidence request.

Checked items are included in the local JSON export. Checking a question does not mark it answered. Notes stay in this browser session. Use the export panel to download or copy a record.

Carry the open questions forward.

Export the selected questions, current inputs, evidence states and source references. Nothing is uploaded, enriched, sent or automatically saved.

Local review payload

Review prepared.

Download the JSON file or select its contents to copy. Nothing has been sent. A prepared review does not mean a download has completed.

If your browser does not save the file, choose Select JSON, copy the selection, and save it as a local .json file.